REFERENCES OF GEOPROSPECTS Ltd (formerly GEOCONSULT Ltd) IN WEST AFRICA
Name of Project | Place and year of works | Type of work done | |
AFCO, South Korean company | Mali, 1996 | Geological analysis and expertise of previous researches for gold | |
Ste GENEVIEVE, Canadian company | Mali and Guinea, 1996 – 1997 | Researches and prospecting for gold on 11 Licenses | |
MARCHMONT RESSOURCES LTD Anglo-Canadian company | Mali, 1997 | Researches and prospecting for gold on SITAKILI License | |
SODINAF, multinational company | Mali, 1997 | Geological analysis and expertise of previous researches for gold | |
ASHANTI MALI S.A filial of ASHANTI GOLDFIELD LTD | Mali, 1997 | Expertise and recommendations on development of Kalana gold deposit | |
AIGM, Russian-Canadian company | Mali, 1997 | Researches and prospecting for gold | |
Société Aurifère de Guinea (SAG)- filial of ASHANTI GOLDFIELD | Guinea, 1997 | Auger drilling and blasting | |
P.D.R.S.II (FIDA) | Guinea, 1997 | Drilling water wells | |
SAG (funding SAG) | Guinea, 1997 | Drilling water wells, drilling and blasting | |
SBK | Guinea, 1997 – 2000 | Geological prospecting, secondary blasting More than 20 000 meters drilled |
|
CBG | Guinea,1997 – 2014 | Long-term exploration program, auger drilling 588 783 meters (53 131 boreholes), core drilling 20 323 meters (1 419 boreholes), opening of access roads –10 307 km, digging of exploration pits 244,9 meters (28 pits), secondary blasting, drilling water wells | |
Arabian-American, American company | Mali, 1998 | Researches and prospecting for gold | |
SMK EAG and Litos | Guinea, 1998 | Drawing up of geological maps and recommendations on exploration of alluvial diamond and gold deposits | |
SEMAFO, Canadian company | Guinea, 1998 | Core drillings, prospecting for nickel | |
SEEG SMIRI BTP (funding BID) | Guinea, 1998 | Drilling of water wells in Siguiri, rehabilitation of old water wells in Koundara | |
Gruppo Volontariato Civile GVC (ONG Italian company, fundingPACVIP) | Guinea, 1998 | Drilling of new water wells and rehabilitation of old wells | |
Soguirusse, for the Ministry of Health (funding KFW) | Guinea, 1998 | Drilling of water wells | |
Plan International Guinea | Guinea, 1998 – 2000 | 94 water wells. Program of drilling of 500 wells was stopped due to rebel’s incursion | |
HIMEX (funding Rio Tinto) | Guinea, 1998 | Opening of access roads, percussion-drilling, blasting on Simandou mountain | |
SMD | Guinea, 1998, 2017 | Auger drilling and blasting in Lero gold mine, geotechnical drilling– 172 meters (7 boreholes) | |
SIPDC | Guinea, 2001 | Drilling of water wells in Conakry | |
ENCO 5 | Guinea, 2001 – 2008 | Drilling water wells in Coyah and Conakry, Earthworks in the extension of the highway “Prince” |
|
COGET (funding SNAPE and PPTE) | Guinea 2002 – 2003 | Drilling of 35 positive water wells in Télimélé | |
ARIOST | Guinea 2003 – 2004 | Core drilling over 2000 meters | |
CBK via CGG | Guinea 2004 – 2010 | Drilling and blasting during the construction of the road to Balandougou bauxite deposit 180 000 m3 of blasted rock, drilling of water wells | |
Guinea Alumina Corporation S.A (GAC) | Guinea 2004 – 2016 | Prospecting bauxite deposits for future alumina refinery, auger drilling 80 75 meters (6 316 boreholes), core drilling 3 164,2 meters (186 boreholes), sampling, various geotechnical testing at the port, on the site of the dam, on the future motorway and railway | |
Fordem International Inc | Guinea 2004 | Geotechnical drilling in the port of Kamsar | |
GOLDER ASSOCIES | Guinea 2004 – 2012 | Opening of access roads for geotechnical boreholes, core drilling 3 728,5 meters, various geotechnical testing | |
Ville de Conakry | Guinea 2004 – 2019 | Over 700 water wells for private clients, including the quarter “Résidence 2000”, French Embassy, Russian Embassy etc | |
MAVAX Sarl | Guinea 2005 | Inclined core drilling 1200 meters | |
RUSAL S.A (Russky Aluminiy) COBAD (Compagnie des Bauxite et d’Alumina de Dian– Dian) | Guinea 2005 – 2015 | Geotechnical testing in Dubréka, Fria, Kamsar, geological prospecting, auger drilling 23 420 meters (1 854 boreholes) | |
CVRD (VALE) S.A | Guinea 2005 – 2011 | Long-term exploration program, auger drilling 52 913,5 meters (4 161 boreholes), core drilling 1 443,7 meters (135 boreholes) opening of access roads (2 461,6 km), digging exploration pits 77 meters (8 pits) | |
SADEKA | Guinea 2006 | Inclined core drilling 1000 meters | |
BHP Billiton | Guinea 2006 – 2010 | Long-term exploration works, auger drilling 147 753,5meters (11 412 boreholes), core drilling 1 271 (92 holes) opening access roads – 3 545 km, | |
Ministère de l’hydraulique et de l’énergie, Société des Eaux de Guinée | Guinea 2006 | 88 test holes, 16 test water wells of large diameter | |
Aliance Mining Commodities (AMC) | Guinea 2006 – 2012 | Long-term exploration program, auger drilling 24 848 meters (1 792 boreholes), core drillings 177,5 meters (12 boreholes) opening of access roads (636,71 km) | |
BSGR | Guinea 2007 – 2010 | Long-term exploration works for bauxites, auger drilling 34 845 meters (2 755 boreholes), core drilling for bauxite 576 meters (50 holes). Long-term exploration works for iron, core drilling 12 524 meters, opening access roads 1290 km | |
MMR | Mali 2008 | Exploration works, auger drilling 20 449 meters (1 481 boreholes), opening of access roads 406 km | |
IMIDRO | Guinea 2008 | Exploration works, auger drilling 2732 meters (354 boreholes), core drilling 217 meters 15 boreholes) | |
HELALIN | Guinea 2009 | Exploration works, auger drilling 626 meters (73 boreholes) | |
IMD | Guinea 2009 – 2012 | Exploration works, auger drilling 6 900 meters (527 boreholes), core drilling 313,5 meters 55 boreholes) opening of access roads 178,5 km | |
SBG / MetalCorpGroup | Guinea 2010 – 2014 | Exploration works, auger drilling 10 267 meters (875 boreholes), core drilling 148 meters (12 boreholes) opening of access roads (221,85 km), digging exploration pits 29 meters (4 pits) | |
MML (Mining and Minerals Limited) | Sierra–Leone 2015 | Exploration works, auger drilling 898 meters (108 boreholes), opening of access roads – 30,12 km | |
TOUBAL | Guinea 2010 – 2011 | Long-term exploration works, auger drilling 9 877 meters (745 boreholes), opening of access roads 154,65 km | |
DJOLIBA | Guinea 2010 – 2011 | Exploration works, auger drilling 745 meters (48 boreholes), opening of access roads 31,73 Km | |
VBG (Vale-BSGR-Guinea) | Guinea 2010 – 2012 | Exploration works; core drilling 30 812,11 meters, forage destructive rotary drilling 496 meters | |
BAUXITE ANGOLA | Guinea – Guinea Bissau 2010 – 2011 | Exploration works, core drilling 428,9 meters (40 boreholes), opening of access roads 69 km | |
EURASIAN RESOURCES | Guinea 2010 – 2018 | Long-term exploration program, BAUXITE Project: auger drilling 124 021 meters (9 742 boreholes), core drillings 5 156,65 meters (383 boreholes) opening of access roads (2 172,24 km), digging exploration pits 237 meters (24 pits) GOLD Project : Core drilling PQ – 564 ,6 meters, dry PQ core drilling– 1 515,45 meters, drilling large diameter 302 mm – 144,6 meters, cable drilling – 297,5 meters Exploration works, auger drilling 6 067 meters (577 boreholes), core and geotechnical drilling 1 342,1 meters (47 boreholes), opening of access roads– 210 km, digging of exploration pits 205,5 meters (24 pits), Geotechnical work in the designed port and railway area, surveying in the port area |
|
ALUFER – BAM (BEL–AIR MINING | Guinea 2012 – 2019 | Exploration works, auger drilling 25 728 meters (2 186 boreholes), core and geotechnical drilling 1 457,1 meters (52 boreholes), opening of access roads 272 km, digging exploration pits 205,5 meters (24 pits) | |
AMG (ATLANTIC MINING GUINEA) | Guinea 2012 – 2014 | Exploration works, auger drilling 11 042 meters (910 boreholes), core drilling 210,8 meters (21 boreholes) opening of access roads (239,19 km) | |
CARDOZ FINANCIAL INTERNATIONAL GROUP | Guinea 2013 – 2016 | Exploration works BAUXITES Project: auger drilling 8 589 meters (712 boreholes), core drilling 122,5 meters (11 boreholes) opening of access roads 222,50 km, IRON Project: core drilling 18 782,3meters (87 holes), opening access roads 91,8 km, |
|
AXIS Mineral Ressources | Guinea 2014 – 2015 | Exploration works, auger drilling 16 148 meters (1 335 holes), opening of access roads – 250,88 km | |
CAMEN Ressources | Guinea 2014 – 2015 | Exploration works, auger drilling 4 049 meters (273 holes), opening of access roads – 112,4 km | |
DINAMIC MINING | Guinea 2014 – 2019 | Exploration works, auger drilling 14 078,6 meters (1 364 boreholes), core drilling 183,7 meters (16 boreholes) opening of access roads (504,81 km) Geotechnical drilling in the port area, including in the marigot on a jack-up platform – 390,95 meters (20 boreholes) |
|
AMR (Alliance Minière Responsable) | Guinea 2015 – 2016 | Exploration works, auger drilling 8 799,9 meters (831 boreholes), core drilling 384,6 meters (31 boreholes) opening of access roads –178,26 km |
|
SKY FOX | Sierra–Leone 2016 | Drilling water wells (10 wells) | |
SMFG (Société des mines de fer de Guinée) | Guinea 2014 – 2016 | Drilling water wells (12 wells) | |
GLOBAL Mining | Guinea 2016 – 2017 | Exploration works, auger drilling 6 131 meters (481 boreholes), opening of access roads – 154,8 km | |
SELLA Mining | Guinea 2016 | Exploration works, auger drilling 1 340 meters (146 boreholes), opening of access roads – 90,638 km | |
SBDT (Société des Bauxites de Dabola–Tougué) MINE AND METALS ENGINEERING GmbH | Guinea 2016 – 2018 | Exploration works, auger drilling 1 652 meters (184 boreholes), core drilling 1 834,6 meters (194 boreholes), geotechnical drilling 162,3 meters (5 boreholes), opening of access roads – 105,22 km, survey | |
MAVCARD BAUXITE PROJECT–SA | Guinea 2017 | Exploration works, auger drilling 1 872 meters (147 boreholes), core drilling 30 meters (2 boreholes), digging of exploration pits 28 meters (3 pits), opening of access roads – 28,41 km |
|
FATALA MINING INVESTMENT COMPANY SAU – FAMIC | Guinea 2017 | Exploration works, auger drilling 2 796 meters (244 boreholes), opening of access roads – 75,613 km | |
FRIGUIA S.A | Guinea 2017 | Drilling boreholes for blasting – 3 119,7 meters (785 boreholes), geotechnical drilling 902,2 meters (40 boreholes) | |
GUINEA MINING HOLDING S.A | Guinea 2017 | Exploration works, auger drilling 2 964 meters (224 boreholes), opening of access roads – 36,616 km | |
KEBO ENERGY S.A | Guinea 2017 | Exploration works, BAUXITES project: auger drilling 13 376 meters (950 boreholes), opening of access roads – 316,79 km GOLD Project: Geological, geochemical and geophysical survey |
|
Guinéenne d’ingénierie et du Génie Civil GIGC | Guinea 2017 | Geotechnical drilling as part of Makona micro hydropower plant project – 229,4 meters (6 boreholes) | |
WSP Canada | Guinea 2017 | Geotechnical drilling for refinery construction – 451,4 meters (8 boreholes), dozing | |
Spectrum Holding Limited | Guinea 2017 – 2019 | Gold exploration, core drilling 1 705 meters (15 boreholes) | |
Guinéenne Braine Touch GBT | Guinea 2017 – 2018 | Exploration works, auger drilling 9 745 meters (839 boreholes), opening of access roads – 242,85 km | |
PIG Mining | Guinea 2017 – 2018 | Exploration works, auger drilling 3 113 meters (426 boreholes), opening of access roads – 191,33 km | |
Sierra Leone | Sierra Leone 2017 – 2018 | 57 water wells drilled for private clients | |
Emirates Global Alumina (EGA) | Guinea 2018 | Auger drilling – Grade Control and Mining boreholes – 13 980,7 meters (1 574 boreholes) | |
QUIXING GUINEE | Guinea 2018 | Exploration works, auger drilling 5 905 meters (389 boreholes), opening of access roads – 74,56 km | |
GUINEENNE DES MINES | Guinea 2018 – 2019 | Exploration works, auger drilling 1 720 meters (183 boreholes) | |
FINIYA RESSOURCES | Guinea 2018 | Exploration works, auger drilling 659 meters (60 boreholes), opening of access roads – 26,55 km | |
Société Guinéenne de la Onzième Brigade de Géologie. Office des Mines de Xinjiang SARLU (11GMXJ) | Guinea 2018 | Exploration works, auger drilling 981 meters (112 boreholes), opening of access roads – 41,18 km |